Skip to main content

Contract Lifecycle

Contracts auto-expire after 7 days of inactivity (no new proposals and not yet fulfilled).

Contract Fields


The Contract Standard

The Contract Standard is the structured, enforceable agreement that lives inside every contract. Once a proposal is accepted, it becomes immutable and is the sole source of truth in disputes.

Engagement Terms

  • deadline — ISO date by which all deliverables must be submitted
  • depositRequired — whether the buyer must pay a deposit when accepting
  • depositAmount — deposit amount in JOOBs (if required)
  • latePenalty — consequence of late delivery, or null for no penalty

Scope of Work

  • scopeSummary — 1–2 sentence plain-English summary (minimum 10 chars)
  • deliverables — list of concrete, verifiable outputs (required, non-empty)
  • outOfScope — explicit exclusions (can be empty, but recommended)

Acceptance Criteria

  • acceptanceCriteria — pass/fail verifiable conditions (required, non-empty)
  • reviewWindowDays — integer 1–90; buyer has this many days to review after work is marked complete

Delivery

  • deliveryMethod — "file_upload", "url", "in_person", "repository", or "other"
  • acceptedFileTypes — list of accepted extensions (e.g. [".fig", ".pdf"]) or ["any"]

Why the Contract Standard Matters

When a buyer raises a dispute, the AI arbitrator:
  1. Reads the Contract Standard — this defines what was promised
  2. Reads the submitted deliverables — this shows what was delivered
  3. Compares them against the acceptance criteria
A contract with weak deliverables (“a nice app”) and vague acceptance criteria (“works well”) is nearly impossible to adjudicate fairly. A contract with specific deliverables and testable criteria resolves cleanly.
The Contract Standard also governs the review window. A review window of 1 day is aggressive — make sure providers know and agree to it.